Dooley, M.1, Gillen, M.2, Davison, P.2 and Geddis, M.3, 1Strathkelvin Instruments, UK, 2Northern Ireland Water, UK, 3William Industrial Systems, UK
(free)Familiar Problems at WwTW’s
• Blowers housed in buildings – huge capital costs
• Blower Room – Inadequate Ventilation • Oversized Blowers
• Poorly Maintained DO Monitors • Very Low Ammonia Levels Achieved ( < 1mg/l NH3 )
• Scum Visible at Aeration Lanes • Anoxic Zones That Have DO Levels (Recirculation)
• Poor Pattern Test in Aeration Lanes
• Compliance At Any Cost!!
Background – Drivers
• Regulator Driven Requirement for Energy Expenditure Reduction
• Current Electricity Cost £30M pa • Target Reduction
• NIW put in hand several projects to deliver above target.
• Aeration Optimisation Project Performance
• Target £205k sustainable per annum.
• Delivered £280k pa.
• Potential £380k pa