Proceedings

Commissioning of United Utilities thermal hydrolysis digestion plant at Davyhulme waste water treatment works

Belshaw, D.1, Edgington, R.1, Jolly, M.2, 1United Utilities, UK, 2Black & Veatch

(free)

With an installed throughput capacity of 121,000 tDS/a, Davyhulme’s sludge processing and recovery centre is capable of treating sludge arising from 60% of the North West’s 7 million population. The facility was designed to increase United Utilities’ (UU’s) renewable energy generation significantly whilst maximising the use of existing assets and ensuring the greatest flexibility in sludge re-use throughout the region.

Another key consideration was to increase the potential for new land recycling outlets by producing an enhanced sludge product. The facility is now fully operational, accepting sludge from all seven of UU’s raw sludge cake feeder sites.

This paper describes key commissioning activities, operational experiences and challenges faced whilst discussing theoretical design figures versus actual targets achieved.

Please fill in your details to download the proceedings



For more information about how Aqua Enviro
can help you, contact us...

Aqua Enviro Ltd

T: 0113 8730728

E: enquiries@aquaenviro.co.uk


c/o Tidal Accounting, HQ Offices, Radley House, Richardshaw Road, Leeds, West Yorkshire, LS28 6LE

  • By submitting this form, you agree that we may use the data you provide to contact you with information related to your request/submission and other relevant Aqua Enviro services. You can unsubscribe from Aqua Enviro marketing emails at any time by clicking the unsubscribe link in the email. To learn more, see our Privacy Policy